Overview
Handover pipeline
where project data flows and where it usually dies - click any stageAI-flagged gaps
generated automatically from intake vs. owner standardChecklist by section
Milestones
click for detailAsk the record
every answer cites the documents it came fromSearch everything
Try: "boiler warranty", "missing", "elevator", "TAB", "training not scheduled"
Document Intake
Drop the GC's closeout package - any format, any structure. Handover reads every file, classifies it against the owner document standard, extracts asset and warranty data, links evidence to checklist items, and generates the gap list back to the GC. Files you drop here are classified live by the same rules engine.
PDF, DWG, XLSX, images - classified on the spot. Or import from a connected source.
Owner standard
received vs. required - click a rowGap letter to GC
auto-draftedEvery gap is compiled into a dated deficiency list, grouped by responsible party. The letter re-drafts itself as new documents arrive.
Turnover Checklist
This is the sign-off list between the project team and Facilities. Each item links to its evidence as documents arrive. Click any status to change it; your changes are saved.
Assets & Warranties
Every piece of equipment in the building, pulled from the closeout documents. Warranty windows are tracked from day one, so you are not paying for repairs that are still under warranty. Click any row for the full record.
Asset registry
| Tag | Description | Bldg | Category | Make / Model | Warranty ends | Documents | Source |
|---|
Trainings
Knowledge transfer from the GC and subs to the Facilities team, scheduled before turnover and recorded for every technician who joins after. Session videos and O&Ms attach to the asset, not a shared drive. Click a row to manage the session.
Training sessions
| System | Provider | Attendees | Scheduled | Status | Recording |
|---|
Punch & Day-2
Every item raised against the building, open and closed, with who raised it, who closed it and how long it took. Day-2 asks are separated so they do not hold turnover hostage. Deferred commissioning items land here automatically from intake. Click a row for the full history.
Punch list
| # | Description | Location | Responsible | Priority | Opened | Due | Age | Status |
|---|
Intelligence
What Handover understands about the building from the data it holds.
Partners
The companies you work with on this project: their people, what they owe, their upload links and their access.
Activity
Who did what in this workspace, and when: uploads, filed documents, closed items, assignments, team changes.
Settings
Your account, this workspace, its buildings and dates, the closeout standard, where documents come from, and billing.
Integrations
Handover connects to the systems you already use. Connect Google Workspace so documents arrive on their own. SharePoint is coming up. Your source documents stay where they are, and Handover reads them there. What it builds from them is the structured record: the classified index, the asset and warranty registry, and the gap analysis.
Executive Brief
Outstanding items, by priority.