Handover Overview

🔍

Overview

One record. Documents stay where they live. Connect Google Drive so documents arrive on their own. Handover indexes them against the owner standard.
Handover Readiness
-
Documents Received
-
vs. owner standard
Checklist Items
-
complete or verified
Warranties on File
-
Open Punch Items
-

Handover pipeline

where project data flows and where it usually dies - click any stage
Standards and RequirementsOwner closeout requirements
→
Construction closeoutGC submits O&Ms, as-builts, warranties, Cx reports
→
Document intakeSorts every file, pulls out the details, matches them to assets and the checklist, and flags what is missing
→
Structured handoverAsset registry, warranty tracker, searchable record
→
OperationsFeeds CMMS, BMS analytics, capital planning

AI-flagged gaps

generated automatically from intake vs. owner standard

Checklist by section

Milestones

click for detail

Ask the record

every answer cites the documents it came from

Search everything

Try: "boiler warranty", "missing", "elevator", "TAB", "training not scheduled"

Document Intake

Drop the GC's closeout package - any format, any structure. Handover reads every file, classifies it against the owner document standard, extracts asset and warranty data, links evidence to checklist items, and generates the gap list back to the GC. Files you drop here are classified live by the same rules engine.

⇪
Drop closeout files here

PDF, DWG, XLSX, images - classified on the spot. Or import from a connected source.

Owner standard

received vs. required - click a row

Gap letter to GC

auto-drafted

Every gap is compiled into a dated deficiency list, grouped by responsible party. The letter re-drafts itself as new documents arrive.

Turnover Checklist

This is the sign-off list between the project team and Facilities. Each item links to its evidence as documents arrive. Click any status to change it; your changes are saved.

Assets & Warranties

Every piece of equipment in the building, pulled from the closeout documents. Warranty windows are tracked from day one, so you are not paying for repairs that are still under warranty. Click any row for the full record.

Asset registry

TagDescriptionBldgCategoryMake / ModelWarranty endsDocumentsSource

Trainings

Knowledge transfer from the GC and subs to the Facilities team, scheduled before turnover and recorded for every technician who joins after. Session videos and O&Ms attach to the asset, not a shared drive. Click a row to manage the session.

Training sessions

SystemProviderAttendeesScheduledStatusRecording

Punch & Day-2

Every item raised against the building, open and closed, with who raised it, who closed it and how long it took. Day-2 asks are separated so they do not hold turnover hostage. Deferred commissioning items land here automatically from intake. Click a row for the full history.

Punch list

#DescriptionLocationResponsiblePriorityOpenedDueAgeStatus

Intelligence

What Handover understands about the building from the data it holds.

Partners

The companies you work with on this project: their people, what they owe, their upload links and their access.

Activity

Who did what in this workspace, and when: uploads, filed documents, closed items, assignments, team changes.

Settings

Your account, this workspace, its buildings and dates, the closeout standard, where documents come from, and billing.

Integrations

Handover connects to the systems you already use. Connect Google Workspace so documents arrive on their own. Your source documents stay where they are, and Handover reads them there. What it builds from them is the structured record: the classified index, the asset and warranty registry, and the gap analysis.

Executive Brief

Outstanding items, by priority.